In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Dag-type dust collector

    Dag-type dust collector

  • Dag-type dust collector

    Dag-type dust collector

  • Warehouse top dust collector

    Warehouse top dust collector

  • Ash suction machine

    Ash suction machine

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 最色影院| 精品一区二区三区四区在线 | 91精品国产福利在线观看性色 | 一区二区三区精品国产 | 最近中文字幕2019高清免费 | 国产午夜精品一区二区三区 | 免费综合网 | 亚洲国产情侣一区二区三区 | 成人性色生活片免费看爆迷你毛片 | 日本一区二区三区在线观看视频 | 国产美女精品自拍 | 久草成人在线视频 | freexxx性亚洲xxxx| 性xxxxfrxxxxxx欧美| 美国毛片网 | 亚洲一区二区三区深夜天堂 | 国产精品美乳免费看 | 一区二区三区免费看 | 新武则天一级淫片免费放 | 校园亚洲春色另类小说合集 | 欧美一级级毛片 | 亚州精品一区二区三区 | 国产精品2023 | 国产精品福利视频手机免费观看 | 欧美一级毛级毛片 | 最新日韩精品 | 欧美猛烈性xbxbxbxb | 最近最新中文字幕大全免费7 | 亚洲国产天堂久久综合9999 | 亚洲美女视频 | 欧美日韩精品一区二区三区视频在线 | 久久经典免费视频 | 中文字幕日韩精品一区口 | 国内视频自拍在线视频 | 日本一区二区免费看 | 欧美男男激情videos高清不卡 | 亚洲人成网站在线观看播放青青 | 中文字幕3 | 国产日韩欧美亚洲 | 欧美理论片在线观看一区二区 | 亚洲欧美男人天堂 |